| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072847 | Name of Scheme: SARAI MADHO WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 1428 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Sep-2024 | Actual Date of Completion (Capex): 13-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200MM PLAIN PIPE | 48.5 | SARAI MADHO | 26.542948 | 81.509817 |
| 2 | 150MM PLAIN PIPE | 51.8 | SARAI MADHO | 26.542948 | 81.509817 |
| 3 | 200MM SLOTTED PIPE | 12 | SARAI MADHO | 26.542948 | 81.509817 |
| 4 | 150MM PLAIN PIPE | 18 | SARAI MADHO | 26.542948 | 81.509817 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 150LPM / 52MTR | SARAI MADHO | 26.542948 | 81.509817 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 50KL / 14MTR | SARAI MADHO | 26.542948 | 81.509817 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | .020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 2.869 | |
| 2 | HDPE PIPE | 125 | .878 | |
| 3 | HDPE PIPE | 140 | .874 | |
| 4 | HDPE PIPE | 160 | .284 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 337 |