Project Completion Certificate (Ground Water)
Scheme ID: 20072847 Name of Scheme: SARAI MADHO WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1428 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Sep-2024 Actual Date of Completion (Capex): 13-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200MM PLAIN PIPE 48.5 SARAI MADHO 26.542948 81.509817
2 150MM PLAIN PIPE 51.8 SARAI MADHO 26.542948 81.509817
3 200MM SLOTTED PIPE 12 SARAI MADHO 26.542948 81.509817
4 150MM PLAIN PIPE 18 SARAI MADHO 26.542948 81.509817
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 150LPM / 52MTR SARAI MADHO 26.542948 81.509817
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 50KL / 14MTR SARAI MADHO 26.542948 81.509817
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 2.869
2 HDPE PIPE 125 .878
3 HDPE PIPE 140 .874
4 HDPE PIPE 160 .284
HSC Connection
Sno. Total Nos.
1 337
Other Details
1.77
0.00
1.77
12-Sep-2024
13-Sep-2024