| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072855 | Name of Scheme: MANA MADANPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 10 |
| Total Population Covered: 2961 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Oct-2024 | Actual Date of Completion (Capex): 02-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS PIPE 300MM AND 150MM | 30M/88.3M | MANA MADANPUR | 26.365673 | 81.84084 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible pump | 650LPM/52M | MANA MADANPUR | 26.365673 | 81.84084 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL/14M | MANA MADANPUR | 26.365673 | 81.84084 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.0185 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE 63MM TO 160 MM | 160 | 13.142 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 562 |