| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072861 | Name of Scheme: DHAURAURA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 10 |
| Total Population Covered: 5611 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 07-Mar-2025 | Actual Date of Completion (Capex): 07-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300MM PLAIN PIPE | 42 | DHAURARAH | 26.061607 | 81.933874 |
| 2 | 150MM PLAIN PIPE | 17.80 | DHAURARAH | 26.061607 | 81.933874 |
| 3 | 300MM SLOTTED PIPE | 13 | DHAURARAH | 26.061607 | 81.933874 |
| 4 | 150MM PLAIN PIPE | 6 | DHAURARAH | 26.061607 | 81.933874 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 940LPM / 54MTR | DHAURARAH | 26.061607 | 81.933874 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 275KL / 16MTR | DHAURARAH | 26.061607 | 81.933874 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | .981 | |
| 2 | HDPE PIPE | 75 | 3.192 | |
| 3 | HDPE PIPE | 63 | 17.359 | |
| 4 | HDPE PIPE | 110 | .761 | |
| 5 | HDPE PIPE | 125 | .702 | |
| 6 | HDPE PIPE | 160 | .385 | |
| 7 | HDPE PIPE | 180 | .210 | |
| 8 | HDPE PIPE | 200 | .142 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 759 |