| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072876 | Name of Scheme: DHARAULI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3919 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Dec-2024 | Actual Date of Completion (Capex): 11-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MMØ Plain Pipe | 6 | DHARAULI | 26.354322 | 81.80221 |
| 2 | 300 MMØ Plain Pipe | 33.50 | DHARAULI | 26.354322 | 81.80221 |
| 3 | 300 MMØ Slotted Pipe | 21 | DHARAULI | 26.354322 | 81.80221 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible Pump | 660 LPM / 52 M | DHARAULI | 26.354322 | 81.80221 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL/14 M | DHARAULI | 26.354322 | 81.80221 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 24.90 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 0.320 | |
| 2 | HDPE PIPE | 75 | 0.519 | |
| 3 | HDPE PIPE | 63 | 10.657 | |
| 4 | HDPE PIPE | 110 | 1.102 | |
| 5 | HDPE PIPE | 140 | 0.218 | |
| 6 | HDPE PIPE | 160 | 0.197 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 453 |