| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072882 | Name of Scheme: Saraiyya Mohan GP water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 3270 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 03-Nov-2024 | Actual Date of Completion (Capex): 06-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM PLAIN PIPE | 4 | SARAIYA MOHAN | 26.174484 | 81.935730 |
| 2 | 200 MM PLAIN PIPE | 47.50 | SARAIYA MOHAN | 26.174484 | 81.935730 |
| 3 | 200 MM SLOTTED PIPE | 20 | SARAIYA MOHAN | 26.174484 | 81.935730 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 550LPM/53Mtr | SARAIYA MOHAN | 26.174484 | 81.935730 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 100 KL / 12MTR | SARAIYA MOHAN | 26.174484 | 81.935730 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.02590 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 4.07 | |
| 2 | HDPE | 63 | 8.82 | |
| 3 | HDPE | 110 | 3.33 | |
| 4 | HDPE | 140 | 2.14 | |
| 5 | HDPE | 160 | 0.425 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 391 |