Project Completion Certificate (Ground Water)
Scheme ID: 20072890 Name of Scheme: PINDORIYA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 15
Total Population Covered: 5610 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Dec-2024 Actual Date of Completion (Capex): 02-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 MMØ PLAIN PIPE 56.50 PINDORIYA 26.18173 81.85223
2 300 MMØ SLOTTED PIPE 26.00 PINDORIYA 26.18173 81.85223
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBEL PUMP 940 LPM / 54 M PINDORIYA 26.18173 81.85223
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 16 M PINDORIYA 26.18173 81.85223
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 29.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 9.689
2 HDPE PIPE 63 21.470
3 HDPE PIPE 110 1.023
4 HDPE PIPE 125 0.994
5 HDPE PIPE 140 1.757
6 HDPE PIPE 160 0.460
HSC Connection
Sno. Total Nos.
1 919
Other Details
5.21
0.00
5.12
05-Sep-2024
17-Dec-2024