Project Completion Certificate (Ground Water)
Scheme ID: 20073012 Name of Scheme: DEEPPUR SVS (O) No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2180 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 05-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.05/90.51 Deeppur 28.832047 78.588022
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 470/45 Deeppur 28.832047 78.588022
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 125/14 Deeppur 28.83211833 78.5879416666
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 125 0.0179
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.0742
2 PN-6 PE100/HDPE 75 0.3656
3 PN-6 PE100/HDPE 63 2.9102
4 PN-6 PE100/HDPE 110 0.124
5 PN-6 PE100/HDPE 125 1.737
6 PN-6 PE100/HDPE 140 0.0817
HSC Connection
Sno. Total Nos.
1 325
Other Details
1.55
0.00
1.55
18-Feb-2026
19-Feb-2026