| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20073281 | Name of Scheme: GADCHAPPA WSS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1936 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Aug-2024 | Actual Date of Completion (Capex): 30-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18/100.49 | GADCHAPPA | 27.737484 | 79.813962 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 24 M3 /43 M | GADCHAPPA | 27.737484 | 79.813962 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 100 KL - 12 M | GADCHAPPA | 27.737461 | 79.813911 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 150 | 0.029 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 3.862 | |
| 2 | HDPE / 6KG | 75 | 0.656 | |
| 3 | HDPE / 6KG | 90 | 1.558 | |
| 4 | HDPE / 6KG | 110 | 1.780 | |
| 5 | HDPE / 6KG | 140 | 0.591 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 319 |