Project Completion Certificate (Ground Water)
Scheme ID: 20073368 Name of Scheme: PURAB GAON & JALAL PUR MAFI No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 5130 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 06-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 50.30 PURAB GAON & JALAL PUR MAFI 26.454078 81.71719
2 300 MM PLAIN PIPE 51 PURAB GAON & JALAL PUR MAFI 26.454078 81.71719
3 150 MM SLOTTED PIPE 8.00 PURAB GAON & JALAL PUR MAFI 26.454078 81.71719
4 300 MM SLOTTED PIPE 15.00 PURAB GAON & JALAL PUR MAFI 26.454078 81.71719
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 900 LPM / 52 M PURAB GAON & JALAL PUR MAFI 26.454078 81.71719
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 14 M PURAB GAON & JALAL PUR MAFI 26.454078 81.71719
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.720
2 HDPE PIPE 75 0.274
3 HDPE PIPE 63 13.843
4 HDPE PIPE 110 0.608
5 HDPE PIPE 140 0.607
6 HDPE PIPE 160 0.648
7 HDPE PIPE 200 0.311
HSC Connection
Sno. Total Nos.
1 671
Other Details
4.08
0.00
3.99
09-Sep-2024
25-Sep-2024