Project Completion Certificate (Ground Water)
Scheme ID: 20073375 Name of Scheme: MAHEMAU WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 6192 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Feb-2025 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 15.50 MAHEMAU 26.459456 81.693926
2 150MM SLOTTED PIPE 4 MAHEMAU 26.459456 81.693926
3 300MM PLAIN PIPE 139 MAHEMAU 26.459456 81.693926
4 300MM SLOTTED PIPE 50 MAHEMAU 26.459456 81.693926
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 650LPM / 54MTR MAHEMAU 26.459456 81.693926
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 375KL / 16MTR MAHEMAU 26.459456 81.693926
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.636
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 3.700
2 HDPE PIPE 63 13.609
3 HDPE PIPE 110 1.869
4 HDPE PIPE 125 0.734
5 HDPE PIPE 160 0.451
6 HDPE PIPE 180 0.870
HSC Connection
Sno. Total Nos.
1 892
Other Details
5.92
0.00
5.83
08-Dec-2024
10-Mar-2025