Project Completion Certificate (Ground Water)
Scheme ID: 20074021 Name of Scheme: GOHADA KHAS VILLAGE WATER SUPPLY SCHEME No. of Villages: 14 No. of Habitation Covered: 17
Total Population Covered: 3186 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2023 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 15.13 M/222.74 M GOHADA KHAS 25.702569 82.724985
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP 640 LPM/44M GOHADA KHAS 25.702569 82.724985
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /12 M GOHADA KHAS 25.702387 82.724895
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI,K-7 100 0.011 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.653 Yes
2 HDPE 75 3.133 Yes
3 HDPE 63 5.345 Yes
4 HDPE 110 1.549 yes
5 HDPE 140 0.08 Yes
6 HDPE 160 0.384 Yes
7 HDPE 180 0.145 Yes
HSC Connection
Sno. Total Nos.
Other Details
2.62
2.62
2.37
01-Oct-2025
31-Dec-2025