Project Completion Certificate (Ground Water)
Scheme ID: 20074084 Name of Scheme: AKHTYARPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1989 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.08 Mtr / 89.17 Mtr AKHTYARPUR 29.140551 77.740358
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200 LPM / 50 Mtr AKHTYARPUR 29.140551 77.740358
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 14 M AKHTYARPUR 29.140551 77.740358
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.427
2 HDPE 75 0.553
3 HDPE 90 0.497
4 HDPE 110 0.265
5 HDPE 125 0.156
6 HDPE 140 0.111
HSC Connection
Sno. Total Nos.
1 460
Other Details
1.75
1.75
1.46
21-Sep-2024
01-Oct-2024