Project Completion Certificate (Ground Water)
Scheme ID: 20074091 Name of Scheme: BATJEORA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2743 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.13 Mtr / 113.13 Mtr BATJEORA 29.05589 77.647008
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50 Mtr BATJEORA 29.05589 77.647008
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 14 M BATJEORA 29.05589 77.647008
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.281 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
2 HDPE 90 1.177 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
3 HDPE 110 0.191 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
4 HDPE 140 0.273 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
5 HDPE 160 0.674 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
HSC Connection
Sno. Total Nos.
1 466
Other Details
2.39
2.39
1.97
22-Oct-2024
23-Oct-2024