Project Completion Certificate (Ground Water)
Scheme ID: 20074155 Name of Scheme: ROSHNABAD SVS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3593 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 18-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20/130 Roshnabad 27.49617 79.467368
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 700 LPM/61 M Roshnabad 27.49617 79.467368
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/14 M Roshnabad 27.49617 79.467368
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 27.49617 79.467368
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.229
2 HDPE 63 5.291
3 HDPE 110 0.333
4 HDPE 140 0.141
HSC Connection
Sno. Total Nos.
1 775
Other Details
3.06
2.98
2.98
31-Dec-2024
13-May-2025