| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20074156 | Name of Scheme: KHWAJA AHMAD PUR KATIYA SVS | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2335 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 11-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.44M/122m | KHWAJA AHMAD PUR KATIYA | 27.52051 | 79.48634 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersibel Pump | 500LPM/68M | KHWAJA AHMAD PUR KATIYA | 27.52051 | 79.48634 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125KL/16M | KHWAJA AHMAD PUR KATIYA | 27.52051 | 79.48634 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 21.50 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.257 | |
| 2 | HDPE | 63 | 4.227 | |
| 3 | HDPE | 110 | 0.227 | |
| 4 | HDPE | 125 | 1.008 | |
| 5 | HDPE | 140 | 1.028 | |
| 6 | HDPE | 160 | 0.377 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 444 |