Project Completion Certificate (Ground Water)
Scheme ID: 20074346 Name of Scheme: Fatehpur Adeek & Sikandarabad MVS(O) No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2961 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.0/112.81 Sikandrabad 28.541882 78.38745
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 617/48 Sikandrabad 28.541882 78.38745
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 175/16 Sikandrabad 28.542082 78.387486
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.315
2 PN-6 PE100/HDPE 75 0.308
3 PN-6 PE100/HDPE 63 7.2413
4 PN-6 PE100/HDPE 110 0.0615
5 PN-6 PE100/HDPE 125 2.3263
6 PN-6 PE100/HDPE 140 0.1791
7 PN-6 PE100/HDPE 160 0.2164
HSC Connection
Sno. Total Nos.
1 430
Other Details
2.85
0.00
2.13
13-Apr-2025
14-Apr-2025