Project Completion Certificate (Ground Water)
Scheme ID: 20074527 Name of Scheme: BEEGHAMAU MVS No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 4265 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 25-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.86 M / 115.48 M BEEGHAMAU 27.29444 79.34603
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 900 LPM / 61 M BEEGHAMAU 27.29444 79.34603
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 14 M BEEGHAMAU 27.29444 79.34603
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 30 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.895 COMPLETE
2 HDPE 63 6.25 COMPLETE
3 HDPE 110 1.347 COMPLETE
4 HDPE 140 1.033 COMPLETE
5 HDPE 160 .815 COMPLETE
HSC Connection
Sno. Total Nos.
1 652
Other Details
4.02
3.89
4.00
25-May-2024
26-May-2024