Project Completion Certificate (Ground Water)
Scheme ID: 20074586 Name of Scheme: NATWARA MVS No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 2600 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25/97.44 Budhanpur Natwara 27.425345 79.515189
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 600LPM/66M Budhanpur Natwara 27.425345 79.515189
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M Budhanpur Natwara 27.425345 79.515189
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 20
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.507
2 HDPE 63 4.024
3 HDPE 110 0.835
4 HDPE 125 0.287
5 HDPE 140 0.520
6 HDPE 160 0.989
HSC Connection
Sno. Total Nos.
1 488
Other Details
2.63
2.56
2.62
01-Jan-2025
12-May-2025