| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20075261 | Name of Scheme: AKDEGWA BHAVPUR GP WSS | No. of Villages: 3 | No. of Habitation Covered: 11 |
| Total Population Covered: 3131 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Dec-2025 | Actual Date of Completion (Capex): 09-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 164.36 | AKDENGWA BAWPURGRANT | 27.326387 | 82.1960382 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBBLE | 700 LPM | AKDENGWA BAWPURGRANT | 27.326387 | 82.1960382 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/14M | AKDENGWA BAWPURGRANT | 27.326068 | 82.960238 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 150MM | 150 | 0.0025 | 0.0025 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE 100 | 63 | 4.115 | |
| 2 | HDPE PN-6 PE 100 | 75 | 1.157 | |
| 3 | HDPE PN-6 PE 100 | 90 | 0.621 | |
| 4 | HDPE PN-6 PE 100 | 110 | 0.889 | |
| 5 | HDPE PN-6 PE 100 | 125 | 0.132 | |
| 6 | HDPE PN-6 PE 100 | 140 | 0.171 | |
| 7 | HDPE PN-6 PE 100 | 160 | 1.354 | |
| 8 | HDPE PN-6 PE 100 | 180 | 0.555 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 410 |