Project Completion Certificate (Ground Water)
Scheme ID: 20075288 Name of Scheme: GHUMAIYA RASULPUR & NAGLA DAMU MVS No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 3961 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 17-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20M/135.40M GHUMAIYA RASULPUR 27.47746 79.41554
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 850LPM/63M GHUMAIYA RASULPUR 27.47746 79.41554
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL/16M GHUMAIYA RASULPUR 27.47746 79.41554
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.037
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.166
2 HDPE 63 5.708
3 HDPE 110 1.807
4 HDPE 125 0.335
5 HDPE 180 2.521
6 HDPE 200 1.311
HSC Connection
Sno. Total Nos.
1 871
Other Details
4.13
4.03
4.12
17-Jun-2024
18-Jun-2024