Project Completion Certificate (Ground Water)
Scheme ID: 20075398 Name of Scheme: SARPARPUR, RASIDPUR TARAI & UGARPUR MVS No. of Villages: 4 No. of Habitation Covered: 10
Total Population Covered: 4735 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 02-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33/123.34 Mtr SARPARPUR 27.53759 79.46572
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 1000LPM/65M SARPARPUR 27.53759 79.46572
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300KL/18M SARPARPUR 27.53759 79.46572
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.25470
2 HDPE 90 3.39460
3 HDPE 110 0.50150
4 HDPE 125 0.129
5 HDPE 140 0.31950
6 HDPE 180 0.74900
HSC Connection
Sno. Total Nos.
1 626
Other Details
4.01
3.88
3.91
31-Jul-2024
01-Aug-2024