Project Completion Certificate (Ground Water)
Scheme ID: 20075839 Name of Scheme: ANWARIA TALIBABAD MV W/S SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1743 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Aug-2024 Actual Date of Completion (Capex): 02-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.06 / 106.27 Anwaria Talibabad 28.82089 79.260543
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 5 HP Submersible Pump 9 / 44 Anwaria Talibabad 28.82089 79.260543
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 75 / 16 Anwaria Talibabad 28.82089 79.260543
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 80 .0217
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.796
2 HDPE Pipe PN-6: Class PE-100 75 0.628
3 HDPE Pipe PN-6: Class PE-100 63 7.190
4 HDPE Pipe PN-6: Class PE-100 110 0.474
5 HDPE Pipe PN-6: Class PE-100 140 0.358
HSC Connection
Sno. Total Nos.
1 285
Other Details
1.55
0.00
1.43
01-May-2024
02-May-2024