| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20075839 | Name of Scheme: ANWARIA TALIBABAD MV W/S SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1743 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 03-Aug-2024 | Actual Date of Completion (Capex): 02-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12.06 / 106.27 | Anwaria Talibabad | 28.82089 | 79.260543 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 5 HP Submersible Pump | 9 / 44 | Anwaria Talibabad | 28.82089 | 79.260543 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Conventional OHT | 75 / 16 | Anwaria Talibabad | 28.82089 | 79.260543 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 80 | .0217 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.796 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.628 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 7.190 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.474 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.358 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 285 |