Project Completion Certificate (Ground Water)
Scheme ID: 20075930 Name of Scheme: NANGLA GANNA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2375 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.01m/123.02m Nangla Ganna BA 29.371044 78.509336
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 10HP 480 LPM/42 M Nangla Ganna BA 29.371044 78.509336
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL /12M Nangla Ganna BA 29.371132 78.509657
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, PE 100 63 3.106
2 HDPE Pipe PN-6, PE 100 75 0.382
3 HDPE Pipe PN-6, PE 100 90 0.514
4 HDPE Pipe PN-6, PE 100 110 0.119
5 HDPE Pipe PN-6, PE 100 125 0.055
HSC Connection
Sno. Total Nos.
1 321
Other Details
1.37
1.37
1.37
03-Aug-2024