Project Completion Certificate (Ground Water)
Scheme ID: 20075954 Name of Scheme: Maheswari Village Water Supply No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4960 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-May-2024 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 26 M/104 M Maheswari 29.504707 78.146191
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 17.5 960 LPM/47 M Maheswari 29.504707 78.146191
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL /14 M Maheswari 29.504688 78.146237
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 Class PE -100 63 10.45
2 HDPE PIPE PN-6 Class PE -100 75 0.35
3 HDPE PIPE PN-6 Class PE -100 90 0.63
4 HDPE PIPE PN-6 Class PE -100 110 0.73
5 HDPE PIPE PN-6 Class PE -100 140 0.57
6 HDPE PIPE PN-6 Class PE -100 160 0.040
7 HDPE PIPE PN-6 Class PE -100 200 0.070
HSC Connection
Sno. Total Nos.
1 1154
Other Details
3.00
3.00
3.00
13-Sep-2024
14-Sep-2024