Project Completion Certificate (Ground Water)
Scheme ID: 20076114 Name of Scheme: SAIFPUR BANGAR WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 1605 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Feb-2023 Actual Date of Completion (Capex): 16-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 3.51
2 HDPE PIPE PN -6: CLASS PE -100 75 0.031
3 HDPE PIPE PN -6: CLASS PE -100 90 0.30
4 HDPE PIPE PN -6: CLASS PE -100 110 2.05
5 HDPE PIPE PN -6: CLASS PE -100 125 0.013
HSC Connection
Sno. Total Nos.
Other Details
1.67
1.67
1.58
16-Dec-2024
17-Dec-2024