Project Completion Certificate (Ground Water)
Scheme ID: 20076118 Name of Scheme: PASHU PURA MV W/S SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.04 / 91.96 Pashu Pura 28.633700 79.210614
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 27.6 / 45 Pashu Pura 28.633700 79.210614
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 125 / 14 Pashu Pura 28.633754 79.210681
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .035 K7
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90 mm HDPE Pipe PN-6: Class PE-100 90 .3565
2 75 mm HDPE Pipe PN-6: Class PE-100 75 .3954
3 63 mm HDPE Pipe PN-6: Class PE-100 63 4.0278
4 110 mm HDPE Pipe PN-6: Class PE-100 110 .1322
5 140 mm HDPE Pipe PN-6: Class PE-100 140 2.382
6 160 mm HDPE Pipe PN-6: Class PE-100 160 .024
7 200 mm HDPE Pipe PN-6: Class PE-100 200 .014
HSC Connection
Sno. Total Nos.
1 368
Other Details
1.67
1.83
1.83
15-Jul-2024
16-Jul-2024