Project Completion Certificate (Ground Water)
Scheme ID: 20076243 Name of Scheme: Nauder WS No. of Villages: 2 No. of Habitation Covered: 407
Total Population Covered: 3720 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 03-Apr-2024 Actual Date of Completion (Capex): 03-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 24 Nauder 25.449415 83.247068
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750/16 Nauder 25.449415 83.247068
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 225/16 Nauder 25.449415 83.247068
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.046
2 HDPE 75 1.476
3 HDPE 63 11.373
4 HDPE 110 2.118
5 HDPE 125 1.02
6 HDPE 140 0.536
7 HDPE 160 0.288
8 HDPE 180 0.027
HSC Connection
Sno. Total Nos.
1 407
Other Details
3.53
3.53
3.53
03-Apr-2024
04-Apr-2024