Project Completion Certificate (Ground Water)
Scheme ID: 20076358 Name of Scheme: Ashu PWS No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 3543 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 16-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.3M / 86.5 Ashu 26.684474 79.637161
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750 LPM/51M Ashu 26.684474 79.637161
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 Kl/ 14 m Ashu 26.684474 79.637161
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.085
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.813
2 HDPE 90 4.174
3 HDPE 110 2.091
4 HDPE 125 .825
5 HDPE 140 .113
HSC Connection
Sno. Total Nos.
1 702
Other Details
2.84
0.00
0.00
15-Jun-2024
17-Jun-2024