Project Completion Certificate (Ground Water)
Scheme ID: 20076412 Name of Scheme: DABARIYA_GURAINI WS No. of Villages: 2 No. of Habitation Covered: 210
Total Population Covered: 3790 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 13-Sep-2024 Actual Date of Completion (Capex): 13-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 36 DABARIYA GURAINI 25.435529 83.458156
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 800/14 DABARIYA GURAINI 25.435529 83.458156
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 250/14 DABARIYA GURAINI 25.435529 83.458156
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.069
2 HDPE 75 1.301
3 HDPE 63 9.334
4 HDPE 110 0.665
5 HDPE 125 2.527
6 HDPE 140 0.387
7 HDPE 160 0.192
8 HDPE 180 0.725
9 HDPE 200 0.369
HSC Connection
Sno. Total Nos.
1 210
Other Details
3.57
3.57
3.57
13-Sep-2024
14-Sep-2024