Project Completion Certificate (Ground Water)
Scheme ID: 20076471 Name of Scheme: RAMPUR CHAUDHARI & ALIPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 3234 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Mar-2025 Actual Date of Completion (Capex): 02-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 19.30 RAMPUR CHAUDHARI 26.388128 81.657754
2 150MM SLOTTED PIPE 9 RAMPUR CHAUDHARI 26.388128 81.657754
3 300MM PLAIN PIPE 55 RAMPUR CHAUDHARI 26.388128 81.657754
4 300MM SLOTTED PIPE 16 RAMPUR CHAUDHARI 26.388128 81.657754
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 700LPM/52MTR RAMPUR CHAUDHARI 26.388128 81.657754
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 200KL/14MTR RAMPUR CHAUDHARI 26.388128 81.657754
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.037
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 8.173
2 HDPE PIPE 63 18.113
3 HDPE PIPE 110 2.351
4 HDPE PIPE 125 0.400
5 HDPE PIPE 140 0.972
6 HDPE PIPE 160 0.584
HSC Connection
Sno. Total Nos.
Other Details
4.05
0.00
4.05
05-Dec-2024
10-Mar-2025