Project Completion Certificate (Ground Water)
Scheme ID: 20076489 Name of Scheme: NABHANPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3007 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Mar-2025 Actual Date of Completion (Capex): 15-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300MM PLAIN PIPE 48 NARBHANPUR 26.14235 82.02028
2 150MM PLAIN PIPE 11.3 NARBHANPUR 26.14235 82.02028
3 300MM SLOTTED PIPE 18 NARBHANPUR 26.14235 82.02028
4 150MM SLOTTED PIPE 18 NARBHANPUR 26.14235 82.02028
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 630LPM / 52MTR NARBHANPUR 26.14235 82.02028
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 200KL / 14MTR NARBHANPUR 26.14235 82.02028
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 10.805
2 HDPE PIPE 110 1.226
3 HDPE PIPE 90 1.779
4 HDPE PIPE 140 1.842
5 HDPE PIPE 160 .707
6 HDPE PIPE 200 1.269
HSC Connection
Sno. Total Nos.
1 472
Other Details
3.67
0.00
3.66
19-Sep-2024
25-Dec-2024