| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076489 | Name of Scheme: NABHANPUR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3007 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Mar-2025 | Actual Date of Completion (Capex): 15-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300MM PLAIN PIPE | 48 | NARBHANPUR | 26.14235 | 82.02028 |
| 2 | 150MM PLAIN PIPE | 11.3 | NARBHANPUR | 26.14235 | 82.02028 |
| 3 | 300MM SLOTTED PIPE | 18 | NARBHANPUR | 26.14235 | 82.02028 |
| 4 | 150MM SLOTTED PIPE | 18 | NARBHANPUR | 26.14235 | 82.02028 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 630LPM / 52MTR | NARBHANPUR | 26.14235 | 82.02028 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 200KL / 14MTR | NARBHANPUR | 26.14235 | 82.02028 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | .017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 10.805 | |
| 2 | HDPE PIPE | 110 | 1.226 | |
| 3 | HDPE PIPE | 90 | 1.779 | |
| 4 | HDPE PIPE | 140 | 1.842 | |
| 5 | HDPE PIPE | 160 | .707 | |
| 6 | HDPE PIPE | 200 | 1.269 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 472 |