| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076517 | Name of Scheme: TIKARI WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 15 |
| Total Population Covered: 10571 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Mar-2025 | Actual Date of Completion (Capex): 06-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MMØ PLAIN PIPE | 30.8 | TIKRI | 26.204637 | 81.865407 |
| 2 | 300 MMØ PLAIN PIPE | 117.00 | TIKRI | 26.204637 | 81.865407 |
| 3 | 150 MMØ SLOTTED PIPE | 10 | TIKRI | 26.204637 | 81.865407 |
| 4 | 300 MMØ SLOTTED PIPE | 52.00 | TIKRI | 26.204637 | 81.865407 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMMERSIBLE PUMP | 880 LPM/56 M | TIKRI | 26.204637 | 81.865407 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 500 KL / 18 M | TIKRI | 26.204637 | 81.865407 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 1.043 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 1.546 | |
| 2 | HDPE PIPE | 75 | 1.753 | |
| 3 | HDPE PIPE | 63 | 26.755 | |
| 4 | HDPE PIPE | 110 | 3.006 | |
| 5 | HDPE PIPE | 140 | 1.051 | |
| 6 | HDPE PIPE | 160 | 0.728 | |
| 7 | HDPE PIPE | 200 | 1.762 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1772 |