| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076529 | Name of Scheme: DAULATPUR LONAHAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 12 |
| Total Population Covered: 8237 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Sep-2024 | Actual Date of Completion (Capex): 17-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 34.3 | DAULATPUR LONAVAT | 26.455838 | 81.703325 |
| 2 | 300MM PLAIN PIPE | 100 | DAULATPUR LONAVAT | 26.455838 | 81.703325 |
| 3 | 150MM SLOTTED PIPE | 13 | DAULATPUR LONAVAT | 26.455838 | 81.703325 |
| 4 | 300MM SLOTTED PIPE | 30 | DAULATPUR LONAVAT | 26.455838 | 81.703325 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 855 LPM/54 MTR | DAULATPUR LONAVAT | 26.455838 | 81.703325 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 500 KL / 16 M | DAULATPUR LONAVAT | 26.455838 | 81.703325 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.430 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 15.953 | |
| 2 | HDPE PIPE | 90 | 3.917 | |
| 3 | HDPE PIPE | 110 | 2.234 | |
| 4 | HDPE PIPE | 140 | 0.122 | |
| 5 | HDPE PIPE | 160 | 0.645 | |
| 6 | HDPE PIPE | 200 | 2.373 | |
| 7 | DI PIPE | 250 | 0.354 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1245 |