Project Completion Certificate (Ground Water)
Scheme ID: 20076613 Name of Scheme: ATAULA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 10-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.89 Mtr / 105.85 Mtr ATAULA 28.812191 77.825244
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 250 LPM / 50 Mtr ATAULA 28.812191 77.825244
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 14 M ATAULA 28.812191 77.825244
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.366
2 HDPE 90 2.076
3 HDPE 110 0.690
4 HDPE 125 0.449
5 HDPE 140 0.290
HSC Connection
Sno. Total Nos.
1 552
Other Details
2.26
2.26
1.85
26-Feb-2025
27-Feb-2025