Project Completion Certificate (Ground Water)
Scheme ID: 20076654 Name of Scheme: GESUPUR BAPHAWAT No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2363 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.28 mtr/93.05 mtr Gesupur Baphawat 29.097877 77.676651
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 200 LPM/ 50 mtr Gesupur Baphawat 29.097877 77.676651
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT(Intze Type) 75 KL/14mtr Gesupur Baphawat 29.097877 77.676651
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0261
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN100 63 3.069
2 HDPE PN100 90 1.083
3 HDPE PN100 110 0.318
4 HDPE PN100 125 0.384
HSC Connection
Sno. Total Nos.
1 454
Other Details
1.94
1.94
1.59
03-Jan-2025
04-Jan-2025