| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076665 | Name of Scheme: RAWA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2434 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 15-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 23.56 Mtr / 90.45 Mtr | RAWA | 28.970196 | 77.48726 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 250 LPM / 56 Mtr | RAWA | 28.970196 | 77.48726 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 75 Kl / 18 M | RAWA | 28.970196 | 77.48726 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0223 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.517 | |
| 2 | HDPE | 75 | 0.417 | |
| 3 | HDPE | 90 | 0.555 | |
| 4 | HDPE | 110 | 0.228 | |
| 5 | HDPE | 125 | 0.0988 | |
| 6 | HDPE | 140 | 0.0950 | |
| 7 | HDPE | 160 | 0.319 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 496 |