| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076678 | Name of Scheme: GAISINGHPUR SVS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2592 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 23-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 19.99 M / 148.61 M | GAISINGHPUR | 27.32010 | 79.51146 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 550 LPM / 61 M | GAISINGHPUR | 27.32010 | 79.51146 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL / 14 M | GAISINGHPUR | 27.32010 | 79.51146 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K-7 | 100 | 21.2 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | .910 | COMPLETE |
| 2 | HDPE | 63 | 4.214 | COMPLETE |
| 3 | HDPE | 110 | .353 | COMPLETE |
| 4 | HDPE | 125 | .112 | COMPLETE |
| 5 | HDPE | 140 | .151 | COMPLETE |
| 6 | HDPE | 160 | .706 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 525 |