Scheme ID: 20076678 Name of Scheme: GAISINGHPUR SVS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2592 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 23-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 19.99 M / 148.61 M GAISINGHPUR 27.32010 79.51146
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 550 LPM / 61 M GAISINGHPUR 27.32010 79.51146
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 14 M GAISINGHPUR 27.32010 79.51146
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K-7 100 21.2 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .910 COMPLETE
2 HDPE 63 4.214 COMPLETE
3 HDPE 110 .353 COMPLETE
4 HDPE 125 .112 COMPLETE
5 HDPE 140 .151 COMPLETE
6 HDPE 160 .706 COMPLETE
HSC Connection
Sno. Total Nos.
1 525
Other Details
2.54
2.48
2.50
23-May-2024
24-May-2024