Project Completion Certificate (Ground Water)
Scheme ID: 20076746 Name of Scheme: KHIRWA NAUABAD No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2498 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 13-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.56 Mtr / 96.24 Mtr KHIRWA NAUABAD 29.084515 77.648856
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 250 LPM / 48 Mtr KHIRWA NAUABAD 29.084515 77.648856
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 12 M KHIRWA NAUABAD 29.084515 77.648856
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0187
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.505
2 HDPE 90 1.552
3 HDPE 110 0.438
4 HDPE 140 0.250
5 HDPE 160 0.369
HSC Connection
Sno. Total Nos.
1 399
Other Details
2.07
2.07
1.69
02-Jan-2025
03-Jan-2025