Project Completion Certificate (Ground Water)
Scheme ID: 20076794 Name of Scheme: Chawali WSS GOV No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2192 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Oct-2024 Actual Date of Completion (Capex): 10-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.08 M / 77.75 M CHAWALI 28.3770894 77.8692068
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 470 LPM / 44 M CHAWALI 28.3770894 77.8692068
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 Kl / 12 M CHAWALI 28.3770404 77.8691401
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.649
2 HDPE 75 0.222
3 HDPE 90 0.092
4 HDPE 110 0.069
5 HDPE 125 0.056
6 HDPE 140 0.127
7 HDPE 160 0.065
HSC Connection
Sno. Total Nos.
1 491
Other Details
1.63
1.63
1.65
12-May-2025
13-May-2025