Project Completion Certificate (Ground Water)
Scheme ID: 20076874 Name of Scheme: GUTHINA SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3345 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 02-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.02M/101.38M GUTHINA 27.36038 79.33248
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 750LPM/63M GUTHINA 27.36038 79.33248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL/16M GUTHINA 27.36038 79.33248
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.041
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.002
2 HDPE PIPE 63 4.892
3 HDPE PIPE 110 0.149
4 HDPE PIPE 140 0.112
5 HDPE PIPE 160 0.684
6 HDPE PIPE 180 0.104
HSC Connection
Sno. Total Nos.
1 571
Other Details
2.67
2.61
2.76
02-Jul-2024
03-Jul-2024