Project Completion Certificate (Ground Water)
Scheme ID: 20076885 Name of Scheme: HAMIRPUR KHAS SVS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4364 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 21-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 32M/151.42m HAMIRPUR KHAS 27.55782 79.34915
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 950LPM/65M HAMIRPUR KHAS 27.55782 79.34915
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275KL/18M HAMIRPUR KHAS 27.55782 79.34915
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 18.20
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 6.537
2 HDPE 63 0.962
3 HDPE 110 0.760
4 HDPE 140 1093
5 HDPE 160 19
6 HDPE 180 0.203
7 HDPE 200 0.115
HSC Connection
Sno. Total Nos.
1 744
Other Details
3.87
3.77
3.78
05-Jun-2024
06-Jun-2024