Project Completion Certificate (Ground Water)
Scheme ID: 20076887 Name of Scheme: KURELI SVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3200 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 18-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30M/101m KURELI 27.34619 79.50059
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 700LPM/61M KURELI 27.34619 79.50059
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/14M KURELI 27.34619 79.50059
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 14.80
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.418
2 HDPE 63 3.673
3 HDPE 110 0.602
4 HDPE 140 0.317
5 HDPE 160 1.204
HSC Connection
Sno. Total Nos.
1 714
Other Details
2.86
2.78
3.22
02-May-2024
03-May-2024