Project Completion Certificate (Ground Water)
Scheme ID: 20076888 Name of Scheme: UJARAMAU NAYAGAON SVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2744 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 10-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20 M / 217.30 M NAYAGAON 27.467439 79.69201
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 600 LPM / 61 M NAYAGAON 27.467439 79.69201
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 14 M NAYAGAON 27.467439 79.69201
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 100 14.7 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 796 COMPLETE
2 HDPE 63 7965 COMPLETE
3 HDPE 110 1165 COMPLETE
4 HDPE 160 766 COMPLETE
HSC Connection
Sno. Total Nos.
1 525
Other Details
2.92
2.81
2.90
10-Jun-2024
11-Jun-2024