Project Completion Certificate (Ground Water)
Scheme ID: 20076891 Name of Scheme: NAUGAON SVS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3531 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 03-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26M/107m NAUGAON 27.45653 79.26437
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 750LPM/61M NAUGAON 27.45653 79.26437
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/14M NAUGAON 27.45653 79.26437
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 23.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.850
2 HDPE 63 6.357
3 HDPE 110 0.129
4 HDPE 140 0.428
5 HDPE 160 0.035
6 HDPE 180 0.484
HSC Connection
Sno. Total Nos.
1 514
Other Details
2.99
2.91
2.85
16-Sep-2024
17-Sep-2024