Scheme ID: 20076895 Name of Scheme: CHANDOUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 20
Total Population Covered: 15000 Base Year: 2023 Intermediate Year: 2035 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 02-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 41.07 M / 136.90 M Chandour 26.41311 81.983222
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 681 & 680 LPM / 50 M Chandour 26.41311 81.983222
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400 KL / 22 M Chandour 26.41311 81.983222
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 150 0.416
2 DI / K7 200 0.349
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 26.452
2 HDPE / PN-6: Class PE-100 75 3.836
3 HDPE / PN-6: Class PE-100 90 2.362
4 HDPE / PN-6: Class PE-100 110 1.706
5 HDPE / PN-6: Class PE-100 125 1.117
6 HDPE / PN-6: Class PE-100 140 0.51
7 HDPE / PN-6: Class PE-100 160 1.499
8 HDPE / PN-6: Class PE-100 180 1.329
HSC Connection
Sno. Total Nos.
1 1246
Other Details
5.49
0.00
5.92
29-May-2025
01-Aug-2025