Project Completion Certificate (Ground Water)
Scheme ID: 20076900 Name of Scheme: KEVTLI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 3570 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 14.04 M / 259.29 M Kevtli 26.367145 81.950753
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 600 LPM / 46 M Kevtli 26.367145 81.950753
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 14 M Kevtli 26.367145 81.950753
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 16.774
2 HDPE / PN-6: Class PE-100 75 1.841
3 HDPE / PN-6: Class PE-100 90 0.571
4 HDPE / PN-6: Class PE-100 110 0.761
5 HDPE / PN-6: Class PE-100 140 0.471
6 HDPE / PN-6: Class PE-100 160 0.03
HSC Connection
Sno. Total Nos.
Other Details
2.38
0.00
2.43
19-Mar-2025
02-Apr-2025