Project Completion Certificate (Ground Water)
Scheme ID: 20076924 Name of Scheme: GUDERA SVS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3020 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 13-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24M/103m GUDERA 27.63113 79.63471
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 650LPM/59M GUDERA 27.63113 79.63471
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/12M GUDERA 27.63113 79.63471
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1325.00
2 HDPE 63 7592.00
3 HDPE 110 1467.00
4 HDPE 140 453.00
5 HDPE 160 782.00
6 HDPE 180 24.00
HSC Connection
Sno. Total Nos.
1 468
Other Details
2.83
2.77
2.79
28-May-2024
29-May-2024