Project Completion Certificate (Ground Water)
Scheme ID: 20077070 Name of Scheme: AIRHO GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3409 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 31-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20 M / 112.36 M AIRHO 79.517661 26.884668
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP-01 750 LPM / 56 M AIRHO 79.517661 26.884668
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL / 14 M AIRHO 79.517661 26.884668
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.026
2 DI 150 0.007
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.5558
2 HDPE 90 4.0229
3 HDPE 110 0.8249
4 HDPE 140 1.3375
5 HDPE 160 1.001
HSC Connection
Sno. Total Nos.
1 634
Other Details
3.56
3.54
3.56
03-Jul-2024
04-Jul-2024