| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077070 | Name of Scheme: AIRHO GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 3409 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 31-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 20 M / 112.36 M | AIRHO | 79.517661 | 26.884668 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP-01 | 750 LPM / 56 M | AIRHO | 79.517661 | 26.884668 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL / 14 M | AIRHO | 79.517661 | 26.884668 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 125 | 0.026 | |
| 2 | DI | 150 | 0.007 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.5558 | |
| 2 | HDPE | 90 | 4.0229 | |
| 3 | HDPE | 110 | 0.8249 | |
| 4 | HDPE | 140 | 1.3375 | |
| 5 | HDPE | 160 | 1.001 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 634 |