Project Completion Certificate (Ground Water)
Scheme ID: 20077102 Name of Scheme: MALGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3349 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 04-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.02 M / 130.32 M MALGAWAN 79.8257 26.908664
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP- 01 750 LPM / 56 M MALGAWAN 79.8257 26.908664
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 14 M MALGAWAN 79.8257 26.908664
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.02955
2 DI 150 0.0146
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.4633
2 HDPE 90 1.9087
3 HDPE 110 0.5957
4 HDPE 140 0.9386
HSC Connection
Sno. Total Nos.
1 503
Other Details
285.07
279.71
284.86
07-Jul-2024
08-Jul-2024