| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077103 | Name of Scheme: RITUKALA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1746 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Sep-2024 | Actual Date of Completion (Capex): 10-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | tubwell | 18.42/89.91 | RITUKALA | 79.950512 | 27.031782 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible pump | 400/66 | RITUKALA | 79.950512 | 27.031782 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | oht | 125/14 | RITUKALA | 79.950512 | 27.031782 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.002 | Rising main |
| 2 | DI | 100 | 0.034 | Rising main |
| 3 | DI | 150 | 0.0083 | Rising main |
| 4 | DI | 200 | 0.0062 | Rising main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.278 | Distribution |
| 2 | HDPE | 110 | 0.710 | Distribution |
| 3 | HDPE | 140 | 0.417 | Distribution |
| 4 | HDPE | 160 | 0.214 | Distribution |
| 5 | hdpe | 90 | 1.43 | distribution |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 396 |